Electric Boats are coming...

One of the hardest things to deal with at Water Monkey Camp is our impact on the planet. We burn roughly 120 gallons of fuel each day running our wake boats. We have always offset all of our CO2 emissions each season but I would much rather not pollute in the first place! The wake boat manufacturers have been slow to innovate with nearly no electric or hybrid options available (the Nautique GS22e is a one-off).

That’s why this article from a local solar installation company is some good news. The founder of Revision Energy retrofitted his small boat with a fully electric outboard motor. 25 hp is not quite what we need to wakeboard, ski and surf all summer here but it is a step forward for boats and hopefully will get the big companies at least thinking about cleaning up their fleets so that one day we can run clean wake boats on our pristine lake.

Article below:

Revision Energy: Electric Outboard

2022 season recap

The 2022 season, our 11th summer, was epic. We had so much fun working with our campers in their watersports progression. It was also equally rewarding to see the campers...returning and new...grow as individuals and as a group in the camp setting. Add to that nearly perfect weather and a dream staff and we could not be happier with how things went.

mastercraft wakeboard boats lake new hampshire

Here are some fun stats!

  • 95.71% full (134 spaces filled out of 140 with 121 unique campers)

  • Campers stayed an average of 1.11 weeks at camp

  • Average number of campers each week was 19.14

  • Campers were 67% boys and 33% girls

  • Average camper age was 13.68 years old

  • 46% new campers and 54% returners

  • Campers chose to wakeboard 45%, wakesurf 45%, waterski 10%

  • Campers came from 12 states (CT, MA, MD, ME, NH, NJ, NY, OH, OR, PA, RI and TX) as well as Canada and Italy

  • 1 new camp game (beach kadima foursquare)

  • 6 coaches, 1 chef and 1 director

  • Average coach age was 20

  • 3,950 meals served by Chef Cher

  • 75 five-gallon buckets of non-meat scraps fed to local hungry pigs to divert food waste from the landfill

  • 10 day campers joined 3 coaches for a week of fun on Lake Sunapee

  • 17,428 unique visitors to www.watermonkeycamp.com

  • 7,706 photos and videos uploaded and shared with camp families

  • We clocked 514 hours on 3 boats…Maverick (Marley), Iceman and Bob (thanks Wheelan family for letting us have Bob back for a week while Maverick was in the shop)

  • Our boats had 18 motor oil changes, 1 transmission oil change, 1 blown water pump and 1 blown engine (yikes)

  • 2,997.878 gallons of premium gas burned producing roughly 27.196 metric tons of CO2 which we offset with contributions to the Society For The Protection of New Hampshire Forests and CoolEffect.org . Our contributions this year will offset about 75 metric tons of CO2 with the extra going towards camper travel to and from camp!

  • We have now offset around 375 metric tons of CO2 since 2012!

And as a parting gift…here is a great fall recipe from Chef Cher: Apple Cider Muffins

We sincerely hope to see all of our campers back here in 2023 and to welcome many more fresh faces to the camp family.

Always feel free to email, call, write, DM, text or stop by to say hello!

Evan


Down to the wire!

Things have been crazy here at camp! We have had so many projects come together just as our staff and campers are about to arrive.

First, let’s rewind to fall ‘21 when we lifted, leveled and built new footings for all of our cabins.

It was a major project and we are so lucky that a super experienced carpenter/contractor tackled it. He first calculated what height the cabin should be at and then, with a laser level, figured out how much each part of the cabin needed to be lifted. This had to happen slowly because of the age of the cabins and how long they have had to settle. If he had lifted them too quickly the wood frames could have broken!

With the cabins raised and leveled, he next dug four foot deep holes and poured new concrete footings which he attached to the building with new, craftsman quality wood trusses. That meant not only a lot of digging and pouring new concrete but also removing the old footings which were mostly cinder blocks. All said and done I moved and stacked four pallets of cinder blocks!

I definitely put my truck to work this offseason! I have brought 20 loads of demolition debris to our dump since August of '21! I probably should have rented a big dumpster but that’s what work trucks are for, right?

With the cabins newly level and on solid footing for the first time in decades it was time to tackle the big goal of the offseason, new bathrooms in every cabin. The existing ones were dark, soggy and, truthfully, a bit gross. My goal with the new bathrooms was to create bright, durable and easy to clean spaces for our campers and guests. I was not great at capturing pictures of the whole process but we ripped out all of the old fixtures, cut out and removed all of the walls up to about 34” and then removed the entire floor, subfloor and joists. Our amazing contractor, Trevor, then rebuilt the rooms from the joists up to the ceiling.

The project was super complicated because each bathroom is different so pretty much every floor, piece of trim and plumbing upgrade was custom. They came out so great, though, and we could not be happier to show our campers!

Of course what would a camp project be without some unexpected issues? As we tore apart the bathrooms we found some leaks in the old roof on one of the cabins. With a new roof definitely not in the budget, camp director and master of absolutely no trades, Evan, hopped to action to lay some rolled asphalt roofing over the bad section of roof. A few weeks later we found some leaky areas on another cabin and, in a driving rainstorm, I again climbed up to patch a spot and save the new bathroom!

Interspersed with the other large projects I also wrapped up the renovated dock for our boats. After installing the new floats I also replaced a few broken planks with new trex decking.

And it is awesome to have a dock that is floating again!

As if all of that was not enough, I also rebuilt all of the mulch beds and landscaping around the cabins! It was a long-overdue project and the cabins now look fantastic. I surrounded each cabin with new river stone to help with drainage and also to secure the new lattice from animals looking to make a home. I then dug up all of the old mulch and dirt, uncovered stones to build new rock boundaries and then filled it all in with natural mulch from locally-felled trees.

And seriously, lastly, cabin 5 received all new windows! The old ones were barely functional and the new windows will let in more light while also functioning better (actually opening and closing).

Whew. That was a lot. As we begin our staff training week it is so satisfying to see the camp looking better than ever.

-Evan

Project Complete!

One of my two major projects this season was to completely replace all of the floats on camp’s massive dock. Over the past few seasons I have noticed that the dock had a tendency to…sink so it was time to do some work!

Our dock is three pieces that make a roughly 40’ by 30’ ‘T’ shape. One piece gets pulled up on shore for the winter and the other two pieces live up on the hill behind our local marina. Here they were in December:

The first step was sourcing plastic floats that were roughly the same size as the existing ones. With the ongoing supply chain issues in all sectors this proved slightly difficult but I managed to find some great ones from a dock supply company in Florida. I won’t shock you with how much new plastic floats cost!

The next step was to remove the old floats. They were HEAVY, mostly fully of water, and all of the bolts were rusted permanently in place. Ratchets worked on some bolts but some required cutting, prying or just general banging until they broke free. I used a hydraulic jack to lift the dock frame section by section and slide the old floats out to make room for the new ones.

My work pictures end there because it got too involved to measure, drill and bolt in the new floats with stainless steel hardware. At the end I replaced nine floats using 36 sets of bolts, lock nuts and washers. Drilling the aluminum dock ate up three specialty drill bits. I tore open eight of my ten knuckles fighting with rusty bolts. In all it took around 30 man-hours to get it done from start to finish!

Many thanks to my dad, Wayne, a retired physician who also happens to be super helpful with projects like these and is willing to work for free!

new hampshire lake view

Here is the view from the worksite on top of the hill! Our marina stores hundreds of boats on the hill in super organized lines that stretch for miles!

Check back soon as we complete our other major project this spring…all new bathrooms for each cabin!